ICE INC logo

Industrial Facilities

(Refrigerated Warehouses, Boat Storage Facilities, and Warehouses)
 
Cheney Brothers, Inc. Warehouse Distribution Center and Headquarters – West Palm Beach, FL
Provided MEP engineering design services for new construction of 190,000 SF distribution and refrigerated warehouse and office facility designed to store food and dry goods in five temperature zones from ambient to 10F below zero. 
 
 
 
Central Chiller Plant/Cooling Tower Replacement, Port of Palm Beach – Riviera Beach, Fl
Provided MEP engineering design services for addition and modification of central chiller plant for the headquarter office building: design of HVAC systems and controls for central air cooling of the executive suites, including the installation of a cooling tower. 
 
 
 
 
Rexall/Sundown Vitamins Manufacturing and Distributing Facility – Boca Raton, FL
Provided MEP engineering design services for conversion of a warehouse to a 85,000 SF vitamin manufacturing plant including facilities for a testing and sampling laboratory; administrative offices; 8 packaging lines; 10 tableting booths; and blend, mixing, and storage areas. 
 
 
 
 
Wal-Mart Warehouse Distribution Center - Brooksville, FL
Provided MEP engineering design services for fast-tracked new construction of nine 750,000 SF distribution warehouse facilities in Texas, Indiana and Florida. Warehouse space included office and computerized/data operations areas with kitchen and dining facilities. 
 
 
 
 
American Express Global Mail Facility – Weston, FL
Provided MEP engineering design services electrical systems for 200,000 SF printing facility including: documentation of existing electrical systems and equipment as well as design of new electrical and mechanical systems for 20,000 SF build-out.
 
 
 
 
The Harborage Club (Boat Storage) – Fort Lauderdale, FL
Provided MEP engineering design services for 46,000 SF boat storage facility with restaurant, boat sales area, and 120 space multi-level robotic parking garage.